A competent tradesperson or reasonably experienced DIYer can fit a straightforward glass partition kit. The glass arrives made to measure, with any required holes and cut-outs completed before delivery. The aluminium channels arrive in 3 metre lengths and must be cut and drilled on site.
This video demonstrates the basic installation process. The exact sequence varies when the partition includes a door, transom, corner or divider, so use the written guidance below for the configuration you have ordered.
PRICE YOUR GLASS PARTITION ONLINE →
Measure the finished tight opening after plastering, flooring and other surrounding work have been completed. Measure the width and height in at least three places and work from the smallest measurement. Do not deduct your own fitting tolerance because the calculator makes the required allowances when working out the glass sizes.
Check the opening with a laser or spirit level. Small variations can normally be managed with suitable packers. If the variation is significant, contact us before ordering.
The ceiling uses a plain U channel. The floor and walls use two-part channel, allowing the glass to be positioned before the second section is clipped into place.
Channels are supplied in 3 metre lengths. They are not cut to the opening and are not pre-drilled, so the installer must measure, cut and drill them on site. Screws and structural fixings are not supplied because the correct fixing depends on the construction of the floor, walls and ceiling.
The rubber gaskets slide into the cleats inside the channels before the glass is fitted. They grip the glass and keep it away from the aluminium. They are not wedge gaskets pushed into the channel after glazing.
The toughened glass panels are manufactured to the finished dimensions calculated for the partition. Any required holes and cut-outs for the ordered door hardware are completed before the glass is toughened. Toughened glass cannot be cut, drilled or altered on site.
Use glass suckers to lift the panels and packers in the base channel to level them. Protect the edges and corners from knocks while moving or storing the glass.
Dry joins are supplied for connecting adjacent glass panels. They create a neat, uniform 4mm joint and are easier to use consistently than silicone.
Each dry join is supplied in a 3 metre length. Cut it to the required size, clean the glass edges and use the adhesive strip on each side to secure it between the panels.
Frameless doors use a hydraulic floor pivot and top patch and open in both directions. Framed doors use side-hung hydraulic hinges, open in one direction and must be ordered with the correct hand.
Set the pivots or position the door frame before fitting the fixed glass panels. The door itself is fitted last, after the surrounding glass and channels are secure.
At least two people are normally needed to handle the glass safely. A straightforward 4 to 5 metre partition can comfortably be fitted in one day by two competent people. A longer partition does not necessarily require more installers, but you should allow additional fitting time.
The partition should normally be measured wall to wall, with the channel cut into the skirting rather than stopping against it. Where trunking is infilled with timber, take the finished measurement from timber to timber. Avoid glass cut-outs around pipes or trunking wherever possible.
If services, uneven surfaces or an unusual layout affect the proposed partition line, contact us before ordering.
National Glass Partitions supplies complete made-to-measure partition kits with glass and door ironmongery where selected. Enter the finished opening measurements in the calculator, see an accurate price and order online.
PRICE YOUR GLASS PARTITION ONLINE →
Questions about fitting? Call 0800 772 3992 or email sales@nationalglasspartitions.co.uk.