The store will not work correctly when cookies are disabled.
We use cookies to make your experience better.To comply with the new e-Privacy directive, we need to ask for your consent to set the cookies.Learn more.
FAST DELIVERY - LOW COST - EVERYTHING CALCULATED FOR YOU
Professional glass partition kits for trade installers. Complete systems from 1000-9000mm with optional integrated doors. 3m aluminium channels, gaskets, glass and dry joints included.
✓
Trade Quality
Designed for builders, carpenters & facilities managers
✓
7 Day Delivery
All sizes 1000-9000mm ready for dispatch
✓
No Sealants Required
Dry joint system for clean, professional installation
Choose Your Kit Size
Kit Size
Ideal For
Application
Door Option
1000-2000mm
Small offices, meeting pods
Commercial fit-outs
Available
2000-4000mm
Standard office partitions
Office refurbishments
Available
4000-6000mm
Large office divisions
Open plan conversions
Available
6000-9000mm
Full room partitions
Commercial spaces
Available
Most kits include an integrated door. Select with or without door when ordering.
What's Included in Every Kit
Glass Panels
10mm toughened safety glass
Pre-cut to exact size
Polished edges
Crystal clear finish
Channel System
U-channel for ceiling (3m lengths)
2-part channels for floor & sides
Quality gaskets included
Cut to size on site
Fittings & Hardware
Dry joints (no silicone needed)
Door ironmongery (if door selected)
All necessary fixings
Professional grade components
Finish Options
Channel Colours
Silver (RAL 9006)
Black (RAL 9005)
Anthracite (RAL 7016)
White (RAL 9010)
Door Hardware Finishes
Satin Stainless Steel
Black
Professional Installation Process
1
Cut Channels
Cut 3m channels to required lengths on site
2
Insert Gaskets
Fit gaskets into channels before fixing to walls
3
Fix Channels
Install U-channel to ceiling & 2-part channels to floor/walls
You'll need: a saw to cut channels to size, drill, spirit level, tape measure, and screwdrivers. Two people are required for safe glass handling and installation. No specialist glazing tools needed.
Can doors be added after installation?
No - if you require a door, it must be selected as part of your initial kit order. Most of our kits include an integrated door option. The door is built into the partition system during installation. U Channel continues all the way across the ceiling and a blanking plate is attached. Screw the door pivot through this and up into the ceiling. Leave a 910mm gap in the floor channel for the door.
How long is delivery?
Standard delivery is approximately 7 working days from order confirmation. We deliver nationwide to site addresses. Some postcodes may have extended lead times.
What are the dry joints?
Dry joints eliminate the need for messy silicone between panels. They provide a clean, professional finish and allow for immediate completion - no drying time required. This speeds up installation significantly.
Need Trade Pricing or Technical Support?
Our trade team can help with specifications, bulk orders, and technical queries. Get trade discounts on multiple kits.