Straight Glass Partition Kits

Straight Glass Partition Kits

Professional glass partition kits for trade installers. Complete systems from 1000-9000mm with optional integrated doors. 3m aluminium channels, gaskets, glass and dry joints included.

Trade Quality

Designed for builders, carpenters & facilities managers

7 Day Delivery

All sizes 1000-9000mm ready for dispatch

No Sealants Required

Dry joint system for clean, professional installation

Choose Your Kit Size

Kit Size Ideal For Application Door Option
1000-2000mm Small offices, meeting pods Commercial fit-outs Available
2000-4000mm Standard office partitions Office refurbishments Available
4000-6000mm Large office divisions Open plan conversions Available
6000-9000mm Full room partitions Commercial spaces Available

Most kits include an integrated door. Select with or without door when ordering.

What's Included in Every Kit

Glass Panels

  • 10mm toughened safety glass
  • Pre-cut to exact size
  • Polished edges
  • Crystal clear finish

Channel System

  • U-channel for ceiling (3m lengths)
  • 2-part channels for floor & sides
  • Quality gaskets included
  • Cut to size on site

Fittings & Hardware

  • Dry joints (no silicone needed)
  • Door ironmongery (if door selected)
  • All necessary fixings
  • Professional grade components

Finish Options

Channel Colours

  • Silver (RAL 9006)
  • Black (RAL 9005)
  • Anthracite (RAL 7016)
  • White (RAL 9010)

Door Hardware Finishes

  • Satin Stainless Steel
  • Black

Professional Installation Process

1

Cut Channels

Cut 3m channels to required lengths on site

2

Insert Gaskets

Fit gaskets into channels before fixing to walls

3

Fix Channels

Install U-channel to ceiling & 2-part channels to floor/walls

4

Install Glass & Dry Joints

Position glass panels and secure with dry joints

VIEW FULL FITTING GUIDE

Trade FAQs

What tools are required for installation?

You'll need: a saw to cut channels to size, drill, spirit level, tape measure, and screwdrivers. Two people are required for safe glass handling and installation. No specialist glazing tools needed.

Can doors be added after installation?

No - if you require a door, it must be selected as part of your initial kit order. Most of our kits include an integrated door option. The door is built into the partition system during installation. U Channel continues all the way across the ceiling and a blanking plate is attached. Screw the door pivot through this and up into the ceiling. Leave a 910mm gap in the floor channel for the door.

How long is delivery?

Standard delivery is approximately 7 working days from order confirmation. We deliver nationwide to site addresses. Some postcodes may have extended lead times.

What are the dry joints?

Dry joints eliminate the need for messy silicone between panels. They provide a clean, professional finish and allow for immediate completion - no drying time required. This speeds up installation significantly.

Need Trade Pricing or Technical Support?

Our trade team can help with specifications, bulk orders, and technical queries. Get trade discounts on multiple kits.

Filter
Set Descending Direction

Items 1-12 of 42

Page
per page
View as Grid List
Filter
Set Descending Direction

Items 1-12 of 42

Page
per page
View as Grid List